• Home
  • Well Control
  • Value Cases
    • Blowout Risk Reduction
    • Extreme Sour Gas Applications
    • 9-Second EDS (Dynamic Positioning Operability)
    • Emergency Response
    • Well Design Optimization
    • High-Pressure Riser (Seabed Isolation Device)
  • Technology
    • K-BOS – CT, HWO, WL/SL
    • K-BOS – Subsea
    • K-BOS – Surface Drilling
    • StackLite SGV
    • StackLite RVM – Surface
    • StackLite RVM – Subsea
    • StackLite Systems
  • About Us
    • Our Team
    • Our Company
    • Our Story
  • Kinetic News Room
  • Contact Us

May 2019

Industry World First: K-BOS Technology Stops a Simulated Blowout

16 May 2019
Houston, May 2019: Kinetic Pressure Control’s 5-15M K-BOS was mounted on Kinetic’s blowout simulator at their test facility in Houston. A nominal flow of 22,000...
Read More

Kinetic and NESR Sign Patnership Agreement, NESR Invests in Kinetic

13 May 2019
Houston, May 2019: Kinetic Pressure Control is pleased to announce that a Sales Channel Partnership Agreement for K-BOS services has been signed with National E...
Read More

OTC 2019: Transocean CEO Announces, “Shear Anything” Technology is a Top Priority

8 May 2019
Houston, May 2019: Described as a technology that Transocean believes to be game changing for the drilling industry, Kinetic Pressure Control’s “shear anything”...
Read More

Kinetic Pressure Control Ltd. Completes a Closed Cap funding round for commercialization of the K-BOS.

1 May 2019
HOUSTON TX, April 2019 – Kinetic Pressure Control has completed another Closed Cap funding round. The funds have been raised from existing investors and will su...
Read More
  • Recent Posts
    • Innovative Seabed Isolation Device for High-Pressure Riser Applications
    • The Ultimate in Safety Tech: The K-BOS Provides Well Control Certainty at up to 50% H2S
    • Optimized Well Design Enabled by an Improved Well Control Barrier: the “Shear Anything” K-BOS
    • Emergency Response Planning Can be Fundamentally Improved with K-BOS
    • K-BOS Reduces Probability of Blowout by 94% or More
  • Archives
    • May 2022
    • April 2022
    • March 2022
    • December 2021
    • November 2021
    • August 2021
    • May 2021
    • March 2021
    • January 2021
    • December 2020
    • July 2020
    • May 2020
    • February 2020
    • January 2020
    • December 2019
    • November 2019
    • October 2019
    • August 2019
    • June 2019
    • May 2019
    • August 2018
    • July 2018
    • January 2018
    • November 2017
    • July 2017
    • October 2016
  • Home
  • Well Control
  • Value Cases
  • K-BOS – Completion, Intervention & Workover
  • K-BOS – Subsea Drilling
  • K-BOS – Surface Drilling
  • Control System
  • Our Team
  • Our Company
  • Our Story
  • Kinetic News Room
  • Contact Us
Copyright © 2025. Kinetic Pressure Control. All Rights Reserved.
Kinetic Pressure Control
  • Home
  • Well Control
  • Value Cases
    ▼
    • Blowout Risk Reduction
    • Extreme Sour Gas Applications
    • 9-Second EDS (Dynamic Positioning Operability)
    • Emergency Response
    • Well Design Optimization
    • High-Pressure Riser (Seabed Isolation Device)
  • Technology
    ▼
    • K-BOS – CT, HWO, WL/SL
    • K-BOS – Subsea
    • K-BOS – Surface Drilling
    • StackLite SGV
    • StackLite RVM – Surface
    • StackLite RVM – Subsea
    • StackLite Systems
  • About Us
    ▼
    • Our Team
    • Our Company
    • Our Story
  • Kinetic News Room
  • Contact Us