• Home
  • Well Control
  • Value Cases
    • Blowout Risk Reduction
    • Extreme Sour Gas Applications
    • 9-Second EDS (Dynamic Positioning Operability)
    • Emergency Response
    • Well Design Optimization
    • High-Pressure Riser (Seabed Isolation Device)
  • Technology
    • K-BOS – CT, HWO, WL/SL
    • K-BOS – Subsea
    • K-BOS – Surface Drilling
    • StackLite SGV
    • StackLite RVM – Surface
    • StackLite RVM – Subsea
    • StackLite Systems
  • About Us
    • Our Team
    • Our Company
    • Our Story
  • Kinetic News Room
  • Contact Us

March 2022

Optimized Well Design Enabled by an Improved Well Control Barrier: the “Shear Anything” K-BOS

29 March 2022
The K-BOS provides the ability to shear anything which enables drilling engineers to consider optimizations to a well design / completion or intervention. Oppor...
Read More

Emergency Response Planning Can be Fundamentally Improved with K-BOS

29 March 2022
For Global Release: With the ability to shut-in on a full flowing blowout in milliseconds, K-BOS provides a dramatic improvement in emergency response time to s...
Read More

K-BOS Reduces Probability of Blowout by 94% or More

29 March 2022
Riyadh Saudi Arabia: The K-BOS results in more than a 94% reduction in the probability of a blowout in surface drilling applications according to a detailed ind...
Read More

9-Second EDS Results in Improved Drilling Rig DP Operability and Enables Shallow Water Drilling DP Ops

22 March 2022
Houston TX: A recent detailed analysis together with Kongsberg has shown that a 9-second EDS results in dramatically improved DP operability and can enable Shal...
Read More
  • Recent Posts
    • Innovative Seabed Isolation Device for High-Pressure Riser Applications
    • The Ultimate in Safety Tech: The K-BOS Provides Well Control Certainty at up to 50% H2S
    • Optimized Well Design Enabled by an Improved Well Control Barrier: the “Shear Anything” K-BOS
    • Emergency Response Planning Can be Fundamentally Improved with K-BOS
    • K-BOS Reduces Probability of Blowout by 94% or More
  • Archives
    • May 2022
    • April 2022
    • March 2022
    • December 2021
    • November 2021
    • August 2021
    • May 2021
    • March 2021
    • January 2021
    • December 2020
    • July 2020
    • May 2020
    • February 2020
    • January 2020
    • December 2019
    • November 2019
    • October 2019
    • August 2019
    • June 2019
    • May 2019
    • August 2018
    • July 2018
    • January 2018
    • November 2017
    • July 2017
    • October 2016
  • Home
  • Well Control
  • Value Cases
  • K-BOS – Completion, Intervention & Workover
  • K-BOS – Subsea Drilling
  • K-BOS – Surface Drilling
  • Control System
  • Our Team
  • Our Company
  • Our Story
  • Kinetic News Room
  • Contact Us
Copyright © 2025. Kinetic Pressure Control. All Rights Reserved.
Kinetic Pressure Control
  • Home
  • Well Control
  • Value Cases
    ▼
    • Blowout Risk Reduction
    • Extreme Sour Gas Applications
    • 9-Second EDS (Dynamic Positioning Operability)
    • Emergency Response
    • Well Design Optimization
    • High-Pressure Riser (Seabed Isolation Device)
  • Technology
    ▼
    • K-BOS – CT, HWO, WL/SL
    • K-BOS – Subsea
    • K-BOS – Surface Drilling
    • StackLite SGV
    • StackLite RVM – Surface
    • StackLite RVM – Subsea
    • StackLite Systems
  • About Us
    ▼
    • Our Team
    • Our Company
    • Our Story
  • Kinetic News Room
  • Contact Us