Innovative Seabed Isolation Device for High-Pressure Riser Applications
2 May 2022
Aberdeen, UK: The use of high-pressure subsea riser systems enables some subsea wells to be drilled efficiently using a jack-up rig, therefore allowing operator...
The Ultimate in Safety Tech: The K-BOS Provides Well Control Certainty at up to 50% H2S
27 April 2022
Unmatched Shearing and Sealing + Unmatched Component Integrity = the Ultimate in Safety With significant operational experience in the Middle East, the field...
Optimized Well Design Enabled by an Improved Well Control Barrier: the “Shear Anything” K-BOS
29 March 2022
The K-BOS provides the ability to shear anything which enables drilling engineers to consider optimizations to a well design / completion or intervention. Oppor...
Emergency Response Planning Can be Fundamentally Improved with K-BOS
29 March 2022
For Global Release: With the ability to shut-in on a full flowing blowout in milliseconds, K-BOS provides a dramatic improvement in emergency response time to s...
K-BOS Reduces Probability of Blowout by 94% or More
29 March 2022
Riyadh Saudi Arabia: The K-BOS results in more than a 94% reduction in the probability of a blowout in surface drilling applications according to a detailed ind...
9-Second EDS Results in Improved Drilling Rig DP Operability and Enables Shallow Water Drilling DP Ops
22 March 2022
Houston TX: A recent detailed analysis together with Kongsberg has shown that a 9-second EDS results in dramatically improved DP operability and can enable Shal...
13-10M K-BOS Qualified to DNVGL-OS-E101 and API 16A PR2
30 December 2021
HOUSTON TX: Kinetic’s 13-5/8″ bore 10,000 psi rated K-BOS (“13-10M K-BOS”) has been optimized for surface drilling and completion applic...
Kinetic Ships 13-5/8″ 10ksi K-BOS to Brazil
30 December 2021
Houston TX: Kinetic Pressure Control is pleased to announce that the first 13-10M K-BOS has been delivered into service for use in a surface drilling applicatio...
K-BOS Showcase at ADIPEC 2021
8 November 2021
Abu Dhabi November 2021: This year’s ADIPEC is a great time to learn more about the K-BOS and its various value cases. Kinetic Pressure Control will be at...
5-15M K-BOS is Certified to DNV-GL DRILL Notation
29 August 2021
Houston TX: The latest 5-15M K-BOS configuration (KB05A502) for ultra sour intervention service has received certification from DNV-GL that it complies with DNV...